Zeon-XC-Service-manual-111999A0

Grease and install the 1st stage sun gear, filling each tooth completely. 19.

18.

Grease 2nd stage sun gear, filling each tooth completely. Install the thrust washer and 2nd stage carrier.

1

1

2

Shell Gadus S5 V150XKD (1.5-10g)

Shell Gadus S5 V150XKD (1.5-10g)

2

Install the upper 3rd stage ring gear o-ring. 20.

Install the upper 3rd stage ring gear o-ring. 21.

1

2

Shell Gadus S5 V150XKD (0.5-2g)

31

Powered by