Zeon-XC-Service-manual-111999A0

Verify the dimple on the 3rd stage ring gear is visible and in the 12’ o-clock position. 14.

Grease the 3rd stage ring gear, filling each tooth completely. 15.

Shell Gadus S5 V150XKD (8.5-36g)

Install the upper 3rd stage ring gear o-ring. 16.

Install the 3rd stage carrier. 17.

30

Powered by