Zeon-XP-Service-Manual-989765A0

Grease and install the 1st stage sun gear, filling each tooth completely. 24

25

Grease and install the input sun gear, filling each tooth completely.

1

1

2

2

Shell Gadus S5 V150XKD (0.5-2g)

Shell Gadus S5 V150XKD (1.5-10g)

26

27

Grease the 1st and 2 nd stage ring gears inside of the end housing, filling each tooth completely.

Install the end housing

Shell Gadus S5 V150XKD (4.5-12g)

35

989765A0

Powered by