Zeon-XP-Service-Manual-989765A0

20

Grease the 3 rd stage ring gear, filling each tooth completely

21

Install the upper 3 rd stage ring gear o-ring

Shell Gadus S5 V150XKD (8.5-36g)

22

Grease 2 nd stage sun gear, filling each tooth completely. Install the thrust washer and 2 nd stage carrier.

23

Install the 3 rd stage carrier

1

Spline plate down

Shell Gadus S5 V150XKD (1.5-10g)

2

34

989765A0

Powered by